Episode 464: You’re Solving the Wrong Problems in Your Construction Business

A problem can be real without being the problem you actually need to solve.

Your project managers really are overwhelmed. Clients really are making selections late. Your superintendent really does call you too often. Your inbox really is full of questions.

But fixing those symptoms directly can sometimes make the business even more dependent on you.

In this episode of The Construction Leading Edge Podcast, Todd Dawalt explains how to stop reacting to downstream symptoms and start finding the upstream problems creating them. He breaks down the Just Enough to Start Trap, owner dependency, and the three systems construction companies need to solve problems closer to the source.

Listen / Watch

Prefer to watch? Watch the full episode below:

Who This Episode Is For

This episode is especially useful for construction business owners who:

  • Keep solving the same problems over and over

  • Feel like their project managers need better time management

  • Have clients making selections during construction

  • Rely heavily on allowances and change orders

  • Get too many questions from superintendents and project managers

  • Are thinking about hiring another PM just to get some relief

  • Spend much of the day answering questions and approving decisions

  • Have too much tribal knowledge living in people’s heads

  • Feel like every problem eventually lands on the owner’s desk

  • Want to fix root causes instead of getting better at firefighting

Problems This Episode Helps Solve

  • How do I find the root cause of recurring construction problems?

  • Why do project management problems often start in preconstruction?

  • How can I reduce late selections and change orders?

  • Why does my superintendent keep calling me with questions?

  • Should I hire another project manager or redesign the process first?

  • How do I reduce owner interruptions?

  • How do I get employees to take more ownership?

  • Why does better software not always solve operational problems?

  • What is the Just Enough to Start Trap?

  • How do I design a construction business that can run without me?

Episode Summary

Todd opens this episode with a story about the Jefferson Memorial.

The visible problem was dirty stone. The natural response was to clean it more often and more aggressively.

But the cleaning itself was contributing to damage.

Instead of continuing to improve the cleaning process, the people studying the problem worked backward: birds were creating the mess, spiders were attracting the birds, insects were attracting the spiders, and the exterior lighting was attracting the insects.

According to Todd’s example, changing when the lights came on reduced the downstream problem.

That is the idea behind what Todd calls a bird poop situation.

The problem you see is real. It simply may not be the problem that needs to be solved.

The same thing happens inside construction companies.

An owner might ask how to make project managers more efficient when the real problem is that PMs are completing preconstruction work during construction.

They might ask how to get customers to make selections faster during the build when the better question is why those selections were not completed before construction began.

They might ask how to manage more owner interruptions when the real issue is a business structurally designed around the owner.

Todd identifies the Just Enough to Start Trap as one of the clearest examples.

The company completes enough preconstruction to begin production and then continues making selections, clarifying scopes, finding trade partners, negotiating pricing, and handling procurement while the field is already building.

The symptoms appear in production, but the causes started earlier.

Todd recommends replacing that approach with Nail the Handoff: a defined preconstruction phase that gives the field team everything it needs to finish instead of just enough to start.

The same upstream thinking applies to owner dependency.

Another notification, dashboard, reminder, approval step, or AI tool may not help if the business itself was designed to route decisions through the owner.

Todd closes with three foundational solutions: create a Strategic Blueprint, become a strong preconstruction company by Nailing the Handoff, and build a “This Is How We Do It” Playbook that moves repeatable knowledge out of the owner’s head.

Key Takeaways With Timestamps

00:00 – The visible problem may not be the problem you should solve
Todd uses the Jefferson Memorial story to show why repeatedly treating a downstream symptom can make things worse when the real cause sits further upstream.

03:46 – A “bird poop situation” is a real problem caused by something else
Todd applies the analogy to construction: what hurts today may be legitimate, but the source of the pain can exist somewhere else in the business.

04:13 – Andrew at GTG Builders realized they were chasing the wrong problems
The company initially thought project managers needed help performing better, but the deeper issues were being created before projects ever reached project management.

07:03 – The Just Enough to Start Trap pushes preconstruction into production
Selections, scopes, trade partners, pricing, and other planning work continue after construction starts, forcing the field to create and execute the plan simultaneously.

08:23 – Nail the Handoff by giving the field everything needed to finish
A strong preconstruction phase ends before production and transfers complete information instead of simply giving the team enough to begin work.

12:09 – Your business is producing the results it was designed to produce
If every question and decision routes through the owner, the company may be structurally designed to depend on that owner.

14:34 – Better answers to the wrong questions can make the business worse
More AI, faster estimates, more reminders, additional approvals, or another hire may amplify the underlying problem instead of eliminating it.

17:26 – Before hiring another PM, ask what work should not exist in the first place
Todd recommends examining unnecessary work and the process a new employee would inherit before increasing overhead.

19:17 – Ask why everything is reaching your desk in the first place
Instead of getting better at managing endless interruptions, redesign the business so fewer issues require owner involvement.

20:13 – Three systems address the upstream problems
Todd recommends a Strategic Blueprint, a strong Nail the Handoff preconstruction process, and a “This Is How We Do It” Playbook.

Key Concepts From This Episode

Bird Poop Situation

A bird poop situation is Todd’s shorthand for a visible problem that is actually the downstream result of something else.

The goal is to trace the symptom backward until you find a cause worth changing.

Upstream Problem Solving

Upstream problem solving asks where a problem was created instead of only addressing where it finally became visible.

A field problem, for example, may have originated months earlier during sales, estimating, or preconstruction.

Just Enough to Start Trap

The Just Enough to Start Trap happens when a company completes enough planning to begin construction but leaves important preconstruction work unfinished.

The production team then has to plan and build simultaneously.

Business Designed to Fail Without You

A company becomes owner-dependent when decisions, knowledge, approvals, and problem-solving are structurally routed through the owner.

The solution is not simply managing those interruptions better. It is redesigning how the business works.

Strategic Blueprint

A Strategic Blueprint defines how the business should operate in the future.

It clarifies the organizational design, ownership, accountability, and the role the owner actually wants to have.

“This Is How We Do It” Playbook

A playbook documents the company’s repeatable way of operating so knowledge no longer depends on memory or tribal knowledge.

It gives employees a system to follow without repeatedly asking the owner for answers.

Resources Mentioned

Construction Leading Edge Resources

Partner Mentioned

Recommended Next Step

Pick one recurring problem that frustrates you or your team.

Do not immediately ask, “How do we fix this?”

Instead, work backward.

Ask:

  • Where does this problem first become visible?

  • What happened immediately before that?

  • What process was supposed to prevent it?

  • Is production discovering something preconstruction should have solved?

  • Does this issue exist because information lives in someone’s head?

  • Does it keep reaching me because ownership is unclear?

  • Are we solving the symptom instead of changing the system?

Then identify one upstream change that could make the downstream problem smaller.

If lack of time is one of your biggest constraints, use the Builder CEO Weekly Operating System.

If late subcontractor commitments, unclear scopes, or material procurement are creating problems, use the Buyout Playbook.

If recurring chaos, weak handoffs, and owner dependency point to a larger operating-system problem, apply for a Business Evaluation Call.

Client Success Stories

Want to see how other construction business owners are applying these ideas?

Watch client success stories from builders, remodelers, and general contractors who have worked with Construction Leading Edge to reduce chaos, improve their systems, and build companies that run with less owner dependency.

Related Episodes

Nail the Handoff System podcast episode thumbnail

Episode 430: Nail the Handoff System: Build a Rock-Solid Preconstruction Checklist Your Team Actually Follows

Learn how to identify recurring project problems upstream and build a preconstruction handoff with your team that prevents missing information from reaching production.

This Is How We Do It Builders podcast episode thumbnail

Episode 432: “This Is How We Do It” Builders: Leading Clients With a Proven Process

Todd explains how standardized communication, deadlines, preconstruction, and client expectations replace reactive project management with a repeatable process your team can consistently follow.

Why Starting Projects Too Soon Is Killing Your Profit podcast episode thumbnail

Episode 460: Why Starting Projects Too Soon Is Killing Your Profit

See how late selections, incomplete buyout, missed scopes, and rushed project starts create Dead Days and other downstream problems that actually begin in preconstruction.

FAQ

What does it mean to solve the wrong problem in a construction business?

It means improving a downstream symptom without fixing the process that created it. A project manager may appear overwhelmed, for example, because unfinished preconstruction work keeps entering production.

What is a “bird poop situation”?

It is Todd’s term for a visible problem that is real but caused by something further upstream. The goal is to trace the problem backward rather than repeatedly treating the symptom.

Why do project management problems often begin in preconstruction?

If projects begin with missing selections, incomplete scopes, unfinished buyout, or unresolved decisions, project managers inherit that unfinished planning while also trying to run production.

How can I reduce the number of questions my superintendent asks me?

Instead of only trying to reduce calls, ask what information the superintendent is missing before the project starts and whether that information should be part of the handoff.

Should I hire another project manager if my current team is overloaded?

Todd recommends first identifying what work should be eliminated, what belongs in preconstruction, and what process the new PM would follow. Hiring into a broken system can simply add overhead.

How do I reduce owner dependency?

Clarify ownership, define roles and decision authority, document repeatable processes, strengthen preconstruction, and redesign the business so fewer questions and approvals automatically route through the owner.

What are the three systems Todd recommends in this episode?

A Strategic Blueprint for organizational design, a strong Nail the Handoff preconstruction process, and a “This Is How We Do It” Playbook documenting how the company operates.

Todd Dawalt
Founder of Construction Leading Edge and host of The Construction Leading Edge Podcast

Todd Dawalt is the founder of Construction Leading Edge and host of The Construction Leading Edge Podcast. Since 2014, Todd and the Construction Leading Edge team have helped construction business owners systematize their companies, reduce chaos, improve profitability, and build businesses that run with less owner dependency.

Full Transcript

00:00
Years ago, the Jefferson Memorial in Washington, DC had a pretty serious problem. The stone was getting dirty, but it was also getting damaged because it was getting cleaned. So what was happening was stone was getting dirty. So the obvious response was clean it more, stronger detergent, more pressure, more frequent washing. But the more aggressively they cleaned it, the more damage they were doing to this national monument. And eventually somebody stopped asking.

00:28
the wrong questions, which were how do we clean it more? What detergent should we use? And they started asking a better question. Like why is this happening in the first place? So they worked backwards and the main problem birds. Well, more specifically bird poop. They asked questions like, why are there so many birds? Well, they found out it was because they were eating spiders. Why were there so many spiders? Because there were so many insects and they kept working backwards until they found something upstream that nobody had been thinking about.

00:58
And what they changed to solve the problem was ridiculously simple. I’ll tell you about that in just a minute. But here’s why this matters to you as a construction business owner. And this took me years to figure out. For a long time when somebody brought me a problem, I assumed the problem they described was the problem I needed to solve. And you may be doing the same thing. Your people may be asking,

01:25
you for something and you may try to give it to them and sometimes it might help. But sometimes what I figured out is I gave people exactly what they asked for and it actually made things worse because I just helped them get better at solving the wrong problem. And that’s one of the big lessons I want to share with you in this episode because you may know exactly what hurts.

01:52
You may know what’s frustrating, but that doesn’t necessarily mean you can see what is causing it. And that’s what I’m going to call a bird poop situation. The problem, the bird poop is real. It’s just not the problem that actually needs to be solved. So this is the construction leading edge podcast. My name is Todd DeWalt from construction leading edge.com. We’re going to be talking about bird poop today and I’ll explain myself in a minute.

02:19
But I have two resources for you. If you are a construction business owner and or a leader and you just feel like you have no time. If your calendar is jam packed, feels like there’s never enough time to actually do your job that you don’t have any real freedom. Then we have a resource available. It is the CEO, the builder CEO weekly operating system has some simple tools you can implement in 15 to 20 minutes a week.

02:47
That will really move the needle for you. Just imagine what if you had more time to focus on building relationships with referral partners? What if you had more time to focus on following up on sales? If you just had a few hours of uninterrupted time a week, what would you do with that? Well, that’s what the builder CEO weekly operating system will help you with. The second one is it’s all about, there’s this missing piece in so many pre-construction phases. It’s something that you’re probably.

03:16
You are doing, especially if you’re a general contractor of any sort, you’re doing it, you’re probably just doing it too late. And it’s the buyout process. If you’re doing it too late, that means you’re carrying risk too long. You’re missing out on profits and you could be dealing with some unnecessary chaos. So go grab my free how to buy out a construction project playbook. The link is in the show notes and you’ll learn some practical steps.

03:46
to lock in profits, protect your margin and reduce risk. Go to the link in the show notes or go to constructionleadingedge.com forward slash buyout B-U-Y-O-U-T. All right, let’s get back to our bird poop conversation. a situation, a similar situation with one of our clients. His name is Andrew, the owner of GTG Builders. He said,

04:13
Quote, I thought we needed help improving the performance of our project managers. What we discovered was that we were actually chasing the wrong problems. So what was actually going on and what does this have to do with the Jefferson Memorial? I’ll explain that in a minute. But think about this, what if you’re asking the wrong questions? What if you’re asking questions like, how do we get clients to make

04:40
decisions faster during the build? What’s the best way to track allowances? We’re constantly dealing with late selections and change orders. How do we improve our change order policy? How do I help my PMs get better at time management? And these all sound like perfectly reasonable questions. But what if the real issue is somewhere upstream? What if by solving these problems, you’re actually making the situation worse? Maybe.

05:09
A better question is how do we get clients to make decisions before the build? Maybe the issue isn’t how do we track allowances better? Maybe it’s why are we relying so heavily on allowances which trigger so much chaos in the first place? Maybe late selections, maybe change orders aren’t primarily a policy problem. Maybe they’re not primarily a tracking problem.

05:37
Maybe your PM doesn’t have a time management problem. Maybe there’s something happening upstream. So what did our friends in Washington, DC do to fix the bird poop situation at the Memorial? They discovered that the insects that the spiders were eating, that the birds were eating, that the birds were pooping were attracted by the exterior lights that came on.

06:04
So instead of finding a better way to clean the stone, instead of figuring out a better detergent, they changed. This is the ridiculously simple thing. This is our taxpayer dollars hard at work. They probably spent a million dollars doing this bird poop study. But what they did was they said, let’s just change the schedule of when the lights come on. So the lights came on a few hours later in the evening. They shut them off a few hours earlier in the morning.

06:34
And fewer insects meant fewer spiders, which meant fewer birds, which meant less bird poop, which meant less cleaning. So they didn’t get better at cleaning the bird poop or the downstream problem. They changed something upstream and the downstream problem got smaller. Maybe you might even say it took care of itself. And this happens all the time in construction. All right.

07:03
One of the clearest examples is something I talk about periodically. is the number one root cause of chaos in construction businesses. It is the just enough to start trap. It’s where we do just enough pre-construction to get construction moving. And then we keep doing what should have been pre-construction work while the project is being built.

07:25
So what that means is the construction team is chasing down selections, figuring out scopes of work, finding trade partners, negotiating terms, pricing out things, managing this tornado of changes all while the field is building the project. This overlap of when we’re doing pre, what should be pre construction work during construction, this is where the chaos lives. Basically.

07:53
If doing this, your construction team is being asked to create the plan and execute the plan at the same time. So the field is just where these problems show up, but the problem may have actually started weeks or months earlier. So what it should look like instead is what we call nailing the handoff. You have a well-defined pre-construction phase that ends before construction starts. Makes sense, right? That’s why it’s called

08:23
pre-construction, no overlap. And then in between you nail the handoff. What that means is giving your team everything they need to finish instead of just enough to start, right? So when that happens, your field team can focus on building instead of stopping constantly to solve these upstream problems. So what happens when you do that? Let’s go back to Andrew.

08:49
Andrew said, we could have spent a lot of time and money trying to improve project management without ever addressing the underlying issues. The problems were showing up in project management, but they were being created upstream in pre construction. So once they started nailing the handoff, it resulted in better control, better visibility, stronger profitability. Most importantly, he said the confidence in the foundation to continue growing the business.

09:19
And he said, by slowing down before construction and developing a more disciplined pre-construction process, we began solving multiple problems at once. Hey, Todd here. Let me know if this sounds familiar. Your phone never stops ringing every subcontractor question, every supplier issue, every schedule change, every customer request lands on your desk. Instead of leading your business, you’re spending all day managing the details and putting out fires.

09:48
Sound familiar? And you probably want your business to grow, right? But when you’re already stretched thin, the gaps in your business start to grow too. And that’s when things start to fall apart. Here at the Construction Leading Hedge podcast, we talk a lot about building a business that runs without you. But we understand that can be hard to take the step and actually start, especially when you already have a million other things pulling at your attention. Our friends at Belay make it easy.

10:16
They pair you with a US-based assistant who takes over the operational tasks that prevent you from leading your business. And they do the vetting, the onboarding, and the matching for you. All you gotta do is schedule a free call, tell them what you need, and they’ll find the right assistant for your team, budget, and workflow in as little as a week so you can start building a hands-off business right away. One of the simplest ways to start getting your time back.

10:45
So text the word EDGE, E-D-G-E, to 55123 or visit the link in the show notes to learn more about Belay and connect with them. Reclaim your time for what matters most. Text the word EDGE to 55123 or click the link in the show notes or the description to take the first step. So what’s another type of request? There’s some other, there’s another bucket of questions that I’m gonna share the top 10 or 12.

11:15
bird poop type questions in a minute. And you may want to listen to that and see if it resonates. Here’s another type of request. It’s, it usually sounds something like, how do I keep my people accountable without chasing them? How can I send daily reminders telling everybody what to do and then follow up with them to make sure they’re actually doing it? How can I see everything my team is doing so nothing gets missed? How can I better sort through the hundreds of text messages plus

11:43
software notifications, plus emails that I need to keep track of every day. Right. Again, reasonable questions that sound like real problems, but sometimes the root issue is something deeper and actually solving. you try to solve those questions directly, it can make things worse. Think of a, a construction business like a machine. All right. Here’s what I’ll tell you. If you want a construction business,

12:09
Your business is producing exactly the results it is designed to produce. It is your machine. Your business has a design. And if we open the hatch, we’ll see what’s going on with your design. And in a lot of cases, if I were to open the hatch on the side of your business, I would see you in there peeking out at me. You would be inside the machine, answering questions, making decisions.

12:36
handling details, filling the gaps, basically your machine is built around you. And that’s, that’s the way it has to be in the beginning, right? You, you start off, you’re wearing all the hats, but then the business grows, but the design doesn’t change and your business is still running through you and around you. And here’s what I’ll tell you. If that’s you, your business is designed to fail without you.

13:05
because when you try to step away, things break down. So can you take a proper week long vacation without answering phone calls all the time? Can you spend an uninterrupted block of four hours working on some high value task without getting interrupted? Those are good questions to ask. Here’s what I found. A business designed to run through and around the owner is a business that’s designed to fail without the owner.

13:35
Not intentionally, nobody intentionally designs the business to fail, but structurally it is designed to be dependent on one person. And here’s the thing, if that’s the underlying issue, if the underlying issue is the business is designed to run through and around the owner, another reminder, another notification, another approval step, another time management,

14:06
Another AI hack, another dashboard may not fix it. It may actually make the machine even more dependent on the owner. Now I hear a lot of, I get a lot of questions from construction business owners when I do webinars, I get them on calls, I get them regularly. And here are a few other wrong questions. These are questions. I want you to listen to this question.

14:34
and see if you’re asking these questions because answering the question directly is like dealing with the bird poop at the Memorial. If you answer it directly, it could make things worse. So one of the questions is how to use AI? How can I use AI to crank out more estimates? Better question would be, are you doing free estimates? And if the answer is yes, how do you change your sales process to a paid?

15:04
pre-construction agreement, or a better question would be instead of how do I crank out more estimates? How do I increase my conversion rate? How do I learn how to sell based on value? How can I hire a salesperson to run appointments for me? Or how can I hire somebody to take some of the load off me? Well, a better question would be how do I create a sales system that they can follow? If you have no sales process, there’s no system for them to follow. If it’s all in your head and you hire somebody, your overhead has just gone up.

15:34
And you’ve got somebody that’s going to ask you a lot more questions. Here’s a good one. This is a common one. How do I hold customers accountable to make selections faster during the build? How can I help my clients better manage their time so they can make selections more efficiently during the build? Here’s a better question. How can I design my pre-construction process to have selections complete before we start?

16:01
So I’m here to tell you, if you’re making selections, if you’re making your clients make selections during the build, you’re in the just enough to start trap. Here’s one. How do I incentivize my people to be more productive or how do I hold them accountable? How do I penalize them when they’re not being productive? Better question is how can I set them up for success? How can I ensure they have everything they need to be successful? Because

16:28
If you were to, this is a common question. How do I put some sort of incentive process in place, financial incentive process? And that’s really risky because studies have shown that complicated or even, well, if they’re not poor, if they’re not well designed, poorly designed or overly complicated incentive programs actually backfire. So a better question is how can I set my people up for success instead of trying to incentivize them?

16:57
How do I get better at scheduling all of these moving parts? Better question is how do I eliminate the decisions and the selections and these things that keep blowing up our schedule instead of asking how do I get better at playing whack-a-mole? Better question is how do I, how do I get into mole prevention or mole eradication business? Another question, how do I get my superintendents to stop calling me with so many questions?

17:26
Better question, what are they missing before the job starts that forces them to call you? How do I hire another project manager so I can get some relief? A few better questions. What work are you expecting that new PM to absorb that shouldn’t exist? What are some things you could just eliminate in the first place? Or what’s the process that your project manager is going to follow?

17:52
Once you hire them, because again, if you hire someone into a business that’s designed to run around you, everything’s in your head. You’re just increasing overhead and increasing questions. Another question I get is how do I get my team to communicate better? Better question is where does our process depend on people remembering to communicate instead of making that.

18:20
A non-issue. does, where does our process depend on people remembering to communicate? Where does our process depend on the tribal knowledge and memory? Here’s one. How do I reduce change orders during construction? Well, better question is why are we discovering scope, design, pricing, or customer decisions after construction has already started? What would it take to get out of this just enough to start trap? How do I get my customers to stop calling me all the time?

18:48
How do I put a policy in place? How do I set that expectation? How do I, you know, all of these questions to deal with customers asking questions. Well, here’s a better question. What would it take to push information to our clients proactively? If they are asking questions, it’s not necessarily because they’re micromanagers or they’re drama queens. They have questions and it’s your job to fill that gap. How do I get my people to take more ownership? How do I get them to be accountable?

19:17
Better question is, have you actually defined what they own? Have you defined what success looks like? And have you given them clarity on what decisions they’re allowed to make without you? And then the last one is, how do I become better at managing all of these things that come across my desk? How do I get better at playing whack-a-mole? A better question is, why are all these things coming across my desk in the first place?

19:46
And an even better question than that is how, would it take to redesign the business? So I don’t have all of these things coming at me. If you’re listening to this thinking, yeah, those sound familiar. Those are the questions I’m asking. And I realize if I answer those questions successfully, it could make things worse. So what do you do if you realize you’re stuck in the just enough to start trap that you’re

20:13
business is designed to fail without you there are three things you need to do. Number one, you need to have a strategic blueprint for your business. You need to have a design of how you want the business to run. As I mentioned earlier, your business is producing exactly the results it is designed to produce. If you don’t like those results, you can either work harder or you can design the business to run without you. So design the business for the future.

20:42
We’re not talking about wrapping an organizational chart around your current people. You need to go two years in the future, get clear on what you want this business to look like, and then design it accordingly. Assign clear ownership so not every decision goes through you and you get to decide what’s your future role. What do you want to focus on? What do you hate? What do you suck at? Let’s design your business accordingly. Here’s a little sliver for watching the video of what a strategic blueprint looks like.

21:12
goes from the high level all the way down to what are, what’s each role accountable for? What are the results and the activities they’re going to do? What happens when you do this? Here’s Cody Reimer, who was on the podcast a while back. He said, they walked in one Monday morning, his phone was quiet, the projects were moving. And he said, that was my first taste of quote, I own a business now, not just a job. And it started with redesigning the business.

21:42
Second thing you need, you’ve got to get out of that just enough to start trap. You need to nail the handoff. Okay. So the just enough to start trap is some combination of free estimates, allowances, missing selections, just in time ordering. There’s a lot of, we’ll figure it out later. This is a hot take, but cost plus contracts often put you right into the just enough to start trap. We got to get out of that. We got to get out of that.

22:10
chaotic mess where we’re doing pre-construction during construction and we got to nail the handoff, right? So here’s what I found after 30 years of doing this and helping somewhere north of 400 construction business owners at this point, the construction companies that grow profitably and successfully, they’re actually a great pre-construction company. So become a great

22:40
pre-construction company. Here’s what happens when you get great at pre-construction. Ashley Mejia said, once we put a real pre-construction and nailed the handoff process in place, our punch lists shrank, clients were happier, the chaos went away. Andy Culp said, jobs are smoother, we’re more profitable. And I’m not stuck making emotional calls just to keep people happy anymore.

23:06
John Springstead said he went from 60 hour work weeks to about 34 hours. And it’s all about becoming great at pre-construction. Where does this pre-construction process live? Great question. That’s the third step is to have a, this is how we do it playbook. This is how we do it. You have to decide, are you going to be a Burger King builder who says have it your way, Mr. And Mrs. Client, you get to dictate the process.

23:35
Or are you going to be a, is how we do it builder. You have a playbook, right? Every professional team, every professional sports team, every professional business team needs a playbook. So you can turn your way of doing things, get it out of your head into a playbook. Wouldn’t it be great to be able to say, to answer a question that you get all the time one last time. That’s what you need to do. Three keys. If you are tired of.

24:04
asking the wrong question. Step one, strategic playbook or strategic blueprint. Step two, become a great pre-construction company and design your nail the handoff process. Number three, create your this is how we do it playbook. So if you’re looking for help with that, the next step schedule a call with my team, schedule a business evaluation call with my team.

24:31
You can go to the link in the show notes or go to the link on the screen. Construction, the leading edge.com forward slash apply. This is for companies doing at least a million dollars in revenue have been in business at least two years and you have a team. So this is not for everybody, but if that’s you go schedule your business evaluation call and take action on this podcast. So my name is Todd DeWald from construction.

25:01
LeadingEdge.com. Thanks for listening. I’ll see you next time.

 